Construction Information

Phase 1 of our construction project is complete.  The Science Labs at JK look awesome and other changes and upgrades made at both schools help to maintain the building envelop to provide a safe and well maintained environment for learning.
  • The roof at Parkview School and the many roof sections at Joyce Kilmer School have been replaced. 
  • The painting and carpet replacement in the Parkview School Office and the Business Office is complete.
  • At Joyce Kilmer School the Science labs have had a complete renovation.   The labs are equipped with peninsula style lab stations with sinks, a teacher demonstration table, an interactive SmartBoard that will enable the teacher to "capture" notes written on the dry erase board so they can be saved electronically and printed.  The SmartBoard also enables the teacher to display software applications and video on the whiteboard.  The rooms have new wall mounted cabinets for storage, new desks arranged in auditorium style, new microscopes, an emergency eyewash and shower, fumehood, and HVAC.
  • The HVAC replacement at Parkview School is complete.  The old units have been removed and the new infrastructure has been installed. 
  • All Parkview classrooms have had the coat closets reconfigured to include new hooks for coats and backpacks and some additional shelves for storage have been installed. 
  • If you ever have any questions about the progress of the building projects, please feel free to contact Dr. Madison at (732) 214-2365 or email at lmadison@milltownps.org.


HVAC infrastructure at PV

HVAC unit at PV

Science Lab in progress

Science Lab in progress

Joyce Kilmer School Carpet Replacement

New Roof

Closet Reconfiguration at PV

New Roof

Lab Tables in JK Science Labs

Completed Science Lab at JK


Phase 2 of our construction project is progressing.  The inside of the building has been upgraded and renovated.  Upgrades include:  classroom and hallway lighting, electical service, bathroom upgrades, the conversion of the old media center into a fully equipped science lab and a general use classroom, a complete renovation of the gymnasium, a new book storage area for guided reading books, and a teacher workroom.  The classroom areas are all complete and the gym is expected to be complete and ready for student use on September 29, 2009.  The gym was completely redone with a new floor, removal of ceiling tiles to enable the installation of new ductwork for HVAC, new bleachers, wall pads, scoreboard, new basketball backboards/hoops, and lobby restoration.  The open ceiling design enables everyone to see the previously hidden circular and square window design that was in the original structure. 

The most recent "field report" from the construction manager may be found by clicking here:  field report.   The report is complete with photos of the work site.  Click: photos to see recent pictures of the JK gym floor and media center window.